Once the City of San Diego approves the grading, Pardee
homes plans to begin construction during the first quarter of this year on the Castlerock housing development. The master plan development (Map compliments of Castlerock Website) of approximately 430 single family homes will be located on the border of San Diego
and Santee, across from West Hills High School at the base of the hillside north
of Mast, just east of SR 52, between Medina Dr. and West Hills Parkway.
The motto of the master planned community
is “A Natural Environment to Live and Thrive”. The homes will be
located on an 18 acre parcel of the total 204 acres. Each single home will be between 1,700 to 3,800 estimated square feet, and include
energy efficient technology. The
architectural design elements will complement the Mission Trails design, capturing
natural light and inland breezes. There
will be a tree lined entryway along Mast Boulevard with a public trail spanning
the eastern edge connecting with Mission Trails Regional Park and Goodan Ranch
to the north. The development will include scenic multiuse
trails, colorful drought tolerant landscaping, along with neighborhood parks. Over 50% of the 204 acres is designated open
space.
For more information, visit the Castlerock website and watch their video tour. Once the development is complete it will be annexed into the City of Santee, who will provide all of its public services.
Virginia Hall
619.258.8585
Virginia@VirginiaHall.com.